S&KLawn & Landscape
Owner Operated. Deal Directly With the Owners.
Korey Sam Estimate

Hardscaping

Paver driveways, walkways, patios, pool decks and seat walls. The parts of a landscape you stand on, so the part you cannot see matters most.

Paver drives, walks, patios and seat walls, built on base that holds up to Florida rain and Florida sun.

A paver installation is judged on the surface and fails on the base. Southwest Florida gives hardscape a hard time: a summer of afternoon downpours, sand subgrade, and slabs that move. The compaction, the base depth and the edge restraint decide whether a patio is still flat in five years.

We build the base for the load the surface will actually carry, which is not the same specification for a walkway and a driveway that takes a truck. Then we lay the field, cut the borders clean, and lock the edges properly.

Because we also do the lighting, wall lights and step lights get sleeved during the build rather than surface-mounted afterwards, and the conduit is already where it needs to be.

Serving

Free estimates on every service, in every area we cover.

What this includes

  • Paver drivewaysBuilt and edged for vehicle loading, with the border laid to the shape of the drive.
  • Walkways and entriesCurved or formal, cut clean at every edge, sloped to drain away from the house.
  • Patios and pool decksSurfaces sized around how the space is actually used and furnished.
  • Seat walls and pillarsStacked block or stone with cap courses, built to sit on and lean against.
  • Steps and grade changesConsistent risers, correct treads, and lighting sleeved in during construction.
  • Repairs and re-levellingSettled sections lifted, re-based and relaid rather than patched.

Hardscaping we have built

Travertine-toned paver patio and walkway leading to a stacked-stone seat wall at golden hour
HardscapingPaver walkway and seat wall

See the full gallery

Common questions

What people ask before they call.

How long does a paver patio or driveway take?

A patio is usually a few days; a driveway that needs the old surface removed takes longer. Most of the time is base preparation, which is also what decides whether it is still flat in five years.

Do pavers sink or shift over time?

Not if the base is right. Sand over soil moves; a compacted aggregate base with proper edge restraint does not. It is the part of the job nobody sees and the only part that determines how it ages.

Can hardscaping be lit?

Yes, and it is easier to do during the build. Lighting recessed under a cap course or into a step is wired before the stone goes down, which is why we prefer to design the two together.

Get a price for hardscaping.

Call now, or send the form and we will call you back the same day.

Call KoreyCall Sam

Request an estimate

Tell us about the hardscaping you need.

Or call an owner directly — Korey 941-303-1490 or Sam 503-660-7496. Korey or Sam answers every enquiry themselves. We never sell or share your details.